7th of March 2013
Fire Safety Systems (FSS) 2012
The Paris MOU on Port State Control (PMOU) carried out a joint Concentrated Inspection Campaign (CIC) with the Tokyo MOU on Port State Control (TMOU) on fire safety systems between September 1 and November 30, 2012. During the campaign, 27 PMOU and 17 TMOU member states focussed on compliance with SOLAS Chapter II-2 requirements on inspected ships. This report documents the results of the campaign for the PMOU Maritime Authorities. Results for the TMOU Maritime Authorities are documented separately.